Video
Parameter
|
|
Model |
nominal diameter mm |
effective diameter mm |
effective sieve surface m² |
Number of layers (layers) |
Power kw |
|
|
|
|
XZS-400 |
400 |
340 |
0.09 |
1-3
|
0.18 |
|
|
|
|
XZS-600 |
600 |
540 |
0.23 |
0.55 |
|
|
|
|
|
XZS-800 |
800 |
740 |
0.43 |
0.75 |
|
|
|
|
|
XZS-1000 |
1000 |
916 |
0.66 |
1.1 |
|
|
|
|
|
XZS-1200 |
1200 |
1126 |
1.0 |
1-2
|
1.1 |
|
|
|
|
XZS-1500 |
1500 |
1416 |
1.58 |
1.5 |
|
|
Details
Trial operation and material trajectory adjustment method:
Pour a small amount of material to be screened into the center of the screen, adjust the material trajectory according to the material flow direction, angle, precision, processing capacity and other factors , Used to extend or shorten the movement time of the material on the screen. The adjustment method is as follows: Open the adjustment hole of the machine base, loosen the fixing screw of the lower weight, and adjust in the opposite direction of the discharge port according to the angle shown on the motor according to the required material trajectory.
Recommend products